Quality Switchgears is loading

Engineered for power.Built for industry.

We design, build, test and commission every board in house to your specification.

  • 200+Boards commissioned
  • 100+Clients served
  • ISO 9001Quality system
  • 2002Established

Cable Management, LV Switchgear, MCC Panels, PCC Panels, APFC Systems, Busbar Trunking, Industrial Automation

CableManagementLVSwitchgearMCCPanelsPCCPanelsAPFCSystemsBusbarTrunkingIndustrialAutomation
Quality Switchgears works at Al Ghani Industrial Estate, Ferozepur Road, Lahore.

About us

Our Vision

To provide cost-effective and technically sound engineering solutions to our customers, according to national and international standards and practices. Every board is engineered, built, and commissioned under ISO 9001, with the client's specification given due priority.

Our Mission

  • To be Pakistan's leading switchgear manufacturer
  • To deliver durable, quality products through innovation and professional expertise
  • To maintain a reliable quality assurance system and a human-oriented workplace
  • To prioritise every client's specification and requirement

Our Values

“Whatever we believe, we claim — and whatever we claim, we fully act on.”

How we deliver

ConsultUnderstand the project load, specification, and site conditions
DesignEngineer the board to the client's drawings and duty schedule
FabricateManufacture in-house with total quality control supervision
DeployInstall, test, and commission on site to WAPDA / IEC / IEEE standards

Our Services

From11kVboardstocabletrays.Engineered,built,andcommissionedinhouse.

Our process.

Engineer reviewing a single-line diagram for a panel board

Engineering

Protection fixed before manufacture begins.

We prepare single-line diagrams, protection settings, and clearances under revision control — so the board is designed for safe, continuous duty before any enclosure is cut.

Technician measuring copper busbars on the fabrication bench

Copper Fabrication

Busbars cut, formed, and finished to drawing.

Copper is punched and bent to the fabrication drawings. Contact faces are dressed for bolted joints, with critical interfaces held to tight dimensional tolerance.

Technicians assembling control panels on the factory floor

Assembly

Built in order — from enclosure to protection.

Devices are fitted and torque-checked in sequence. Parts are traced and work is logged under our ISO 9001 system so every board can be identified and verified.

Inspector verifying a circuit breaker inside a switchgear enclosure

Inspection & Testing

Inspected on the bench. Proven before release.

Each board is visually checked, then given dielectric withstand and continuity tests. Nothing is released until insulation and function meet the specified routine tests.

Finished switchgear panel prepared for site dispatch

Dispatch

Documented, crated, and ready for site.

As-built records and the quality dossier travel with the board. Crating and handover documents are complete before dispatch so installation can start without delay.

  1. Engineering

    Protection fixed before manufacture begins.

    We prepare single-line diagrams, protection settings, and clearances under revision control — so the board is designed for safe, continuous duty before any enclosure is cut.

    Engineer reviewing a single-line diagram for a panel board
  2. Copper Fabrication

    Busbars cut, formed, and finished to drawing.

    Copper is punched and bent to the fabrication drawings. Contact faces are dressed for bolted joints, with critical interfaces held to tight dimensional tolerance.

    Technician measuring copper busbars on the fabrication bench
  3. Assembly

    Built in order — from enclosure to protection.

    Devices are fitted and torque-checked in sequence. Parts are traced and work is logged under our ISO 9001 system so every board can be identified and verified.

    Technicians assembling control panels on the factory floor
  4. Inspection & Testing

    Inspected on the bench. Proven before release.

    Each board is visually checked, then given dielectric withstand and continuity tests. Nothing is released until insulation and function meet the specified routine tests.

    Inspector verifying a circuit breaker inside a switchgear enclosure
  5. Dispatch

    Documented, crated, and ready for site.

    As-built records and the quality dossier travel with the board. Crating and handover documents are complete before dispatch so installation can start without delay.

    Finished switchgear panel prepared for site dispatch

Our Products

L.T. Main Panel Board

ACB rating
Up to 6300 A
Protection
ACB / MCCB / LBS
Instruments
Built-in metering & protection
System voltage
415 V, 50 Hz, 3-phase & neutral
Enclosure
Sheet steel, powder coated
Inspect system

Medium Voltage Switchgear

Voltage class
11 kV, 3-phase, 3-wire, 50 Hz
Current rating
630–2500 A
Rupturing capacity
25 kA
Switching
VCB / LBS
Busbars
Insulated & tinned copper
Inspect system

Motor Control Center

Form
Standard / compartmentalized MCC
Starters
DOL / Auto Star Delta / Soft start
Motor voltages
110 V / 220 V / 415 V
Architecture
Common power bus, motor control units
Inspect system

Clients

Certificates & Honours